This page contains Examination Documents for the Draft South London Waste Plan examination-in-public.
Examination Document from the Inspectors
INSP03 – Matters, Issues and Questions
INSP04 – Provisional Hearing Programme
INSP04a - Revised Provisional Hearing Programme
INSP06 - Inspectors Closing Remarks from Hearings
INSP07 - Inspectors' Post-hearings Letter
INSP08 - Inspectors’ Note on the Main Modifications
Examination Documents from the local authorities
SWLP01 - Response to Preliminary Matters
SLWP02a - Schedule of Main Modifications (5th March 2021)
SLWP02b - Schedule of Main Modifications (16th July 2021)
SLWP03a - Schedule of Additional Modifications (5th March 2021)
SLWP03b - Schedule of Additional Modifications (16th July 2021)
SLWP04 - Emails of Slough Council
SLWP05 - SoCG with Central and East Berkshire
SLWP06 - SA on Main Modifications
SLWP07 - Updated Plan Appendix 2
SLWP10 - Beddington Restoration Management Plan (2015)
SLWP11 - London Plan Topic Paper on Waste (2018)
SLWP12 - London Plan Waste Forecasts + Apportionments (SLP)
SLWP13 - UK Waste Sector COVID-19 Response and Resilience Report (2020)
SLWP14 - SLWP Response to Inspectors' Note INSP05
SLWP15 - Statement of Common Ground with the Mayor of London
SLWP16 - Waste Authority Monitoring Report
SLWP17 - Statement of Common Ground with the Wimbledon Park Residents Association
Examination Documents from participants
OTH01 - Updated Opinion of Conformity with the 2021 London Plan from the Mayor of London
OTH02 - Wimbledon Park RA Response to Inspectors' Note INSP05
OTH03 - Updated Letter of Conformity with the 2021 London Plan from the Major of London